PRODUCTS
新闻资讯
- 别再把锚杆钻机当消耗品,它决定的是支护体系的底层信用
- 边坡、基坑、管廊、矿山:四类工地对锚杆钻机的隐藏要求
- 井下记录:一台锚杆钻机如何把每根锚杆从9分钟压到3分钟
- 锚杆钻机选气动还是液压?一次讲清隧道掌子面的真实取舍
- 隧道施工新利器:钻锚注一体机如何重塑锚杆钻机作业标准?
联系我们
电话:0510-83208848
邮箱:1301666944@qq.com
地址:X306, Huishan District, Wuxi City, Jiangsu Province
ZG7389-0A 89 Triple bit
89 triple drill bit is installed at the bottom of the drill pipe, the top of the drill bit is inlaid with alloy, which is convenient for drilling the drill pipe. There are two nozzles on both sides of the barrel of the drill bit, the diameter of the nozzles is 1.6~3.0mm earlier, and the annular gas nozzles are installed around the nozzles to ensure coaxial injection of slurry. Three single nozzles are installed on the tool body to spray high pressure water. For some soft geological structures to the end, no need to replace the drill, can be slowly lift rotary jet, improve work efficiency.





客服QQ